DEVELOPERS: academic of NAS of Ukraine Pivniak G.F., prof. Bondarenko V.I., prof. Tabachenko М.М., associate prof. Falshtinskii V.S., associate prof. Dichkovskii R.А., associate prof. Svietkina S.Yu., engineer Timoshenko Ye.V., engineer Lozinskii V.G, engineer Saik P.B.
 
PROJECT ESSENCE: New technology schemes of WUCG have been developed and they allow to provide mining, complex processing of gasification products and recuperation of the rock mass heat. New construction of gas generator in regime of controlled gasification accounting for natural factors and technological parameters in closed environmental safety cycle has been developed. 
 
PRINCIPAL SCHEME OF WELL UNDERGROUND GASIFICATION OF THE COAL SEAMS
PRINCIPAL SCHEME OF WELL UNDERGROUND GASIFICATION OF THE COAL SEAMS
1 – coal seam;  2 – injection well; 3 – gas-extractive well; 4 - mobile incendiary devices; 5 – injection pipeline; 6 – gas-extractive pipeline; 7 – heat-exchanger recovery; 8 – fire chuckhole; 9 – elaborated area; 10 – tips of vertical and horizontal wells; 11 – surface
 
PARAMETERS OF SPREADING OF THE TEMPERATURE FIELD OF THE ROCK-COAL ARRAY ALONG THE ROCK SEAM
PARAMETERS OF SPREADING OF THE TEMPERATURE FIELD OF THE ROCK-COAL ARRAY ALONG THE ROCK SEAM
 
APPLICATION AREA: Off-grade stocks of black and brown coal with the seams depth from 50 m and more, dropping angle 0 – 90 degrees, rock bed thickness 0,4 m and more at under-mining and up-mining in ascending and descending order, and also fuel slates, heavy (paraffinized) oil.
 
ECONOMIC EFFECT:
  • Productivity of the station of WUCG: 13,6 – 76 thousands m3 of generator gas with combustion heat 5,4 – 11,7 MDj/m3; 134,8 – 431,7 t. of chemical substances.
  • Prime cost: the station – 102-293,4 UAH/thousands m3; power energy 0,09-0,24 UAH/kW*hour.
  • Pay-back period for enterprise 1,5-3,0 years. 